Hello all. I have a question about the conditional sequence. Thanks.
flowsheets 1000s (sequence day1) flowsheets 2000s (sequence day2) flowsheets
3000s(sequence nigt)
Sequence ovsq intl calc day1 day2 nigt
in "calc" block, I will calculate powr and descide to execute sequnce (day1
day2) or (nigt) rather than all sequences.
How can I do?
Thanks a lot