s***r 发帖数: 1 | 1 盖新房的同学们能不能帮我看看这个site cost list,以前见过的那些homeowner都说是
6万5左右,这个list怎么有8万阿。。。
Excavation and backfill 3,000
Final grading 1,600
Seed and straw 2,000
Hauling and dirt removal 8,000
Concrete pumps 1600
Sewer and water hook ups (house to tap) 7,000
Construction entrance 1,500
Final driveway (Asphalt) 4,000
Erosion control/silt fence/street flush 2,500
Dumpsters and trash removal 2,500
Utility fees 1,500
Geo Tech | T**J 发帖数: 3340 | 2 这么细的东西,别指望有人能回答。花钱雇人是正道。
【在 s***r 的大作中提到】 : 盖新房的同学们能不能帮我看看这个site cost list,以前见过的那些homeowner都说是 : 6万5左右,这个list怎么有8万阿。。。 : Excavation and backfill 3,000 : Final grading 1,600 : Seed and straw 2,000 : Hauling and dirt removal 8,000 : Concrete pumps 1600 : Sewer and water hook ups (house to tap) 7,000 : Construction entrance 1,500 : Final driveway (Asphalt) 4,000
|
|