m*******d 发帖数: 274 | 1 Hi, we have put an offer for a house, we did home inspection. Radon test
result is 8.4,passing 4.0 EPA standard. The thing is that the seller said
they already have radon mitigation system in the house.This means either
their radon mitigation system does not work, or their Radon was super high
before, even with mitigation system, it still cannot lower it to the
standand level. That would be really unlucky. Shall we ask them to replace
and fix their mitigation system? Will the mitigation system really work? It
is just so hard to buy a house in NY. We really like the house, do not want
to give it up. Thank you for all the information. | l******a 发帖数: 16364 | 2 我觉得可以要求seller更换rfadon mitigation system,然后再作一次test.
It
want
【在 m*******d 的大作中提到】 : Hi, we have put an offer for a house, we did home inspection. Radon test : result is 8.4,passing 4.0 EPA standard. The thing is that the seller said : they already have radon mitigation system in the house.This means either : their radon mitigation system does not work, or their Radon was super high : before, even with mitigation system, it still cannot lower it to the : standand level. That would be really unlucky. Shall we ask them to replace : and fix their mitigation system? Will the mitigation system really work? It : is just so hard to buy a house in NY. We really like the house, do not want : to give it up. Thank you for all the information.
| m*******d 发帖数: 274 | 3 Thank you for your reply. We have not signed the contract yet. So they
should replace this mitigation system and have another test. Do they pay the
fee for another test or I pay the fee? If it is still too high, then I hope
that I should be able to walk away from the contract. The other way is they
fix this before signing the contract. I am not sure how fast this
mitigation system can be replaced. Thanks a lot!
【在 l******a 的大作中提到】 : 我觉得可以要求seller更换rfadon mitigation system,然后再作一次test. : : It : want
| l******a 发帖数: 16364 | 4 你有agent吗?和他商量一下先
the
hope
they
【在 m*******d 的大作中提到】 : Thank you for your reply. We have not signed the contract yet. So they : should replace this mitigation system and have another test. Do they pay the : fee for another test or I pay the fee? If it is still too high, then I hope : that I should be able to walk away from the contract. The other way is they : fix this before signing the contract. I am not sure how fast this : mitigation system can be replaced. Thanks a lot!
|
|