由买买提看人间百态

boards

本页内容为未名空间相应帖子的节选和存档,一周内的贴子最多显示50字,超过一周显示500字 访问原贴
Military版 - 首战即决战 美国重型运载火箭计划首飞就载人
相关主题
NASA新一代飞船猎户座(orion)年内首试为什么美国不搞飞船?
NASA施铁腕 全面禁止中国访客美国宇航局将在2025年捕获近500吨重的小行星
NASA将于2011年夏天对大推力运载火箭做出最终选择这个spaceX到底是忽悠还是for real?
NASA tests Saturn V engine partsnasa 的Orion是深空探险吧
姜波案的关键:他是否违反了保密规定。美国新一代重型火箭发动机进行点火测试
联邦政府养的全是一帮懒汉弱智废材!登月需要什么级别的火箭?
外媒称中国可借星球大战打败美国两篇新闻
美航天局发布在建最大火箭照片 为登火星铺路 来源: 5W40 于 2014-01-15 23:33:49 [档案] [博客] [旧帖] [给我悄悄话] 本文已被阅读:475次 字体:调大/调小/重置长5和FH比,价格贵10倍
相关话题的讨论汇总
话题: nasa话题: em话题: launch话题: mission话题: would
进入Military版参与讨论
1 (共1页)
f******t
发帖数: 19544
1
一万年太久,只争朝夕。
http://spacenews.com/nasa-to-study-launching-astronauts-on-first-sls-mission/
NASA to study launching astronauts on first SLS mission
by Jeff Foust — February 15, 2017
WASHINGTON — NASA plans to study putting astronauts on the first launch of
its Space Launch System heavy-lift rocket, a move that could introduce new
delays and other complications into the vehicle’s development.
NASA Acting Administrator Robert Lightfoot, in a speech at the Space Launch
System/Orion Suppliers Conference here Feb. 15, and a memo emailed at the
same time to the agency’s workforce, said he had directed Bill Gerstenmaier
, NASA associate administrator for human exploration and operations, to
begin a study on the feasibility of putting a crew on the first SLS mission,
known as Exploration Mission 1 (EM-1).
“The study will examine the opportunities it could present to accelerate
the effort of the first crewed flight and what it would take to accomplish
that first step of pushing humans farther into space,” NASA spokesman Bob
Jacobs said in a statement to SpaceNews confirming the planned study.
Current plans call for the EM-1 mission to launch in late 2018 without a
crew. The first crewed flight would be EM-2, which NASA is planning to
launch in 2021. However, an assessment in 2015 performed as Orion reached a
development milestone known as Key Decision Point C indicated that there was
a 70 percent chance the EM-2 mission would launch no later than April 2023.
Lightfoot, in the memo, said the study will examine the technical and
schedule issues of flying a crew on EM-1. “I know the challenges associated
with such a proposition, like reviewing the technical feasibility,
additional resources needed,” he wrote, “and clearly the extra work would
require a different launch date.”
Lightfoot didn’t discuss the specific challenges, but they are likely to
involve both issues with the Orion spacecraft and SLS vehicle. NASA did not
plan to have a full life support system in the Orion spacecraft for the EM-1
mission as it would not have a crew on board. Last year, the agency said it
was considering shortening the EM-2 mission since it would be the first
Orion flight with the complete life support system.
“Lockheed Martin will support NASA on a study to determine the feasibility
of flying a crew on Exploration Mission 1,” said Allison Miller, a
spokeswoman for Orion prime contractor Lockheed Martin, in a Feb. 15
statement. “We’ll look at accelerating remaining crew system designs, as
well as potential technical and schedule challenges and how to mitigate them
.”
The SLS that will be used on EM-1 will use an upper stage derived from the
Delta 4, known as the Interim Cryogenic Propulsion Stage (ICPS). NASA plans
to replace it on EM-2 and future SLS missions with the more powerful
Exploration Upper Stage (EUS), which would be human-rated for crewed
missions.
NASA stopped work on human-rating the ICPS a year ago, following direction
from Congress in the report accompanying the fiscal year 2016 appropriations
bill. Congress has pushed NASA to accelerate work on the EUS, allocating
additional funding for it, so that it would be ready for EM-2. NASA
announced in January that EUS had passed its preliminary design review,
keeping the stage on track for launch in 2021 on the EM-2 mission.
That work, as Lightfoot suggested in his memo, would likely delay the EM-1
launch from its current estimated launch window of September to November
2018. Industry sources said they believe addressing the various issues would
delay the mission to 2019 or 2020. That would still be sooner than current
NASA schedules for EM-2.
Lightfoot, in the memo, also addressed broader concerns about NASA’s future
direction. “From my interactions with the transition team, NASA is clearly
a priority for the President and his administration,” he wrote, adding
that when he received information from the administration about its plans
for the agency, he would share it with employees.
“There has been a lot of speculation in the public discourse about NASA
being pulled in two directions – what has come before and what we want to
do now. At NASA, this is an ‘and’ proposition, not an ‘or,’” he added
near the end of the memo. “We must work with everyone to secure our
leadership in space – and we will.”
l******t
发帖数: 55733
2
请领导先飞
a********r
发帖数: 4013
3
目测是项目拖延的借口
1 (共1页)
进入Military版参与讨论
相关主题
长5和FH比,价格贵10倍姜波案的关键:他是否违反了保密规定。
随后粉墨登场的将是联邦政府养的全是一帮懒汉弱智废材!
五十年前NASA就能发射土星五外媒称中国可借星球大战打败美国
由私人公司发射火箭美航天局发布在建最大火箭照片 为登火星铺路 来源: 5W40 于 2014-01-15 23:33:49 [档案] [博客] [旧帖] [给我悄悄话] 本文已被阅读:475次 字体:调大/调小/重置
NASA新一代飞船猎户座(orion)年内首试为什么美国不搞飞船?
NASA施铁腕 全面禁止中国访客美国宇航局将在2025年捕获近500吨重的小行星
NASA将于2011年夏天对大推力运载火箭做出最终选择这个spaceX到底是忽悠还是for real?
NASA tests Saturn V engine partsnasa 的Orion是深空探险吧
相关话题的讨论汇总
话题: nasa话题: em话题: launch话题: mission话题: would